Project: Route 287 Rehabilitation; Bridgewater, NJ
Prime Contractor: Intercounty Paving Associates
Our Customer: Tiffany Electric Inc.
We used our offset trencher with its internal loading conveyor to trench and load the solid rock into trucks for disposal. In addition, we completed over 1500 LF of 3-6” directional drills across the highway. This allowed the traffic to be uninterrupted and no open cutting or disturbance to the existing road surface.